Pascal Place, Leatherhead – Ground Floor
Project Description
Pascal Place, Leatherhead - Ground Floor CAT A + Refurbishment
The works comprised the CAT A + refurbishment of the Ground Floor demise to include:
- Formation of new breakout area c/w fully fitted kitchen with integrated appliances and Corian worktop and meeting room.
- Installation of new ceiling and floor void fire and acoustic barriers. New FD60 Fire Door to serve lift motor room c/w SSS ironmongery. New black aluminium frame Crittal style glazed door to serve newly constructed meeting room and feature black aluminium frame Crittal style glazed partitioning to serve demise entrance foyer to create a customer waiting area.
- Resprayed the aluminium window, door frames and ceiling grid c/w installation of new mineral fibre ceiling tiles.
- LED lighting, Emergency Lighting, Fire Exit Blades.
- New carpet tiles and vinyl floor coverings throughout.
- Relocation of existing fire detection equipment to suit new demise layout and to provide ceiling void detection.
- New data cabling throughout c/w data cabinet, floor boxes and floor grommets.
- Validation of all HVAC, Electrical and Fire Services, repair, modification and replacement as required c/w new supply and return air grilles.
- Newly decorated throughout the demise to include, ceiling, bulk head, walls and joinery c/w all finishes.
- Decorations extended to Ground Floor entrance lobby, to include walls and painted joinery
- Testing and certification.